Client: Arcelor Mittal
Location: Burns Harbor, Indiana

This project is for the installation of a robotic steel slab scarfing machine for automotive applications, which is capable of scarfing 90,000 tons of steel per month.

For this client we design foundations for the facility, which include two slab transfer cars, a slab turner, robot, scarfer enclosure, semi-gentry crane and baghouse. The steel scarfer building contains exhaust hoods and ductwork. The new hydraulic and electrical building part of the project includes piping and conduit routing.

Our services include all of the design, installation engineering and installation of this project.
CLOSE >