Client: Severstal North America, Inc.
Location: Sparrows Point, MD

A changeover to equipment inline with the federal mandate on secondary emissions requires Severstal to demolish some of their existing equipment and replace it with a BOP Wet Scrubber.

STEVENS performs the demolition of all current equipment and excavates 5,000 yards of land. We pour 2,000 yards of new concrete foundations and control the erection of the new equipment. During this process, we set the pumps, and all process piping is fabricated and erected. The new piping is tied into the existing building operations and the duct work is installed.