Are you tired of trusting your projects to unreliable pipe fabrication companies?
Go with the pipe fabrication experts equipped to handle any piping system you need.
With STEVENS, your project will be completed on schedule and within budget. You'll get the piping solutions you need when you partner with the best pipe fabrication experts in Michigan.
Our piping fabrication team has worked on various projects, from small to large, and has completed numerous unique piping orders.
As industry leaders, we understand how to complete projects correctly, on time, and within budget.
Our pipe fabrication shop has decades of experience meeting customer specifications, completing complex orders, and providing on-time delivery to ensure that our clients' projects are completed on schedule.
Every business and industry relies on piping systems. STEVENS specializes in pipe fabrication for a variety of industries, including the following:
Energy industry
Oil & Gas
Chemical
Power
Waste Water
Government
Food & Beverage
On our 2.8-acre site, we have a 40,000-square-foot pipe fabrication shop with a 28-foot ceiling clearance. Regardless of the size of your piping project, we can handle it.
Click the button below if you'd like a custom quote for your job.
Or keep reading to learn more about the metal piping solutions we offer.
Our fabrication company can handle a wide range of pipe fabrication projects that other facilities cannot.
Whether you need 12" to 72" diameter pipes, pipe racks, equipment skids, or support steel, we've got you covered.
We can accommodate any size project or design with our 15-ton overhead crane and 22 feet of clearance under the hook in our fabrication bay.
As an added bonus, we offer 14 welding stations equipped with one- or two-ton jib cranes, as well as an assembly station and work table.
Interested in learning more about how our pipe fabrication services can benefit you? Check out some of our most recent work to see how we helped these companies with pipe manufacturing and installation.
Location: New Milton, West Virginia
STEVENS has performed several projects for MarkWest.
At their Midpoint Compressor site, near New Milton, West Virginia, our work started with a separate order with our wholly-owned subsidiary, CDMG, performing all of the pipe design. That was followed up by our fab shop, fabricating and shipping all of the spools as well as the slug catcher.
On-site, we performed site excavation and spoil removal. We placed 1,700 tons of limestone over a geotextile fabric. STEVENS performed all layouts, including anchor bolts, and installed more than 1,600 cy of concrete foundations and slabs encasing 110 tons of rebar.
With foundation, anchor bolts, and pipe racks in place, STEVENS proceeded to rig and set the three compressors, set and grout all equipment skids and tanks and then install and test all large and small bore piping. Much of this was done in the middle of winter.
Categories : |
Pipe Fabrication
|
---|
Location: East Chicago, Indiana
A third project well worth highlighting is the #2 Slab Caster Upgrade at ArcelorMittal Indiana Harbor West Facility.
During five months in 2016, STEVENS made extensive modifications to existing foundations. Our crews performed heavy rigging followed by precision level and alignment of a new slab caster along with refurbishing equipment from the tundish down to the cut-off machine — all with minimal engineering. Most of the piping for the new spray chamber, water, grease, air, and hydraulic we field routed and installed “as-built”.
All of the work was performed over multiple shifts, working more than 70,000 man-hours without a single safety incident.
Categories : |
Pipe Fabrication
|
---|
Location: New Milton, West Virginia
STEVENS has performed several projects for MarkWest.
At their Midpoint Compressor site, near New Milton, West Virginia, our work started with a separate order with our wholly-owned subsidiary, CDMG, performing all of the pipe design. That was followed up by our fab shop, fabricating and shipping all of the spools as well as the slug catcher.
On-site, we performed site excavation and spoil removal. We placed 1,700 tons of limestone over a geotextile fabric. STEVENS performed all layouts, including anchor bolts, and installed more than 1,600 cy of concrete foundations and slabs encasing 110 tons of rebar.
With foundation, anchor bolts, and pipe racks in place, STEVENS proceeded to rig and set the three compressors, set and grout all equipment skids and tanks and then install and test all large and small bore piping. Much of this was done in the middle of winter.
Categories : |
Pipe Fabrication
|
---|
Location: East Chicago, Indiana
A third project well worth highlighting is the #2 Slab Caster Upgrade at ArcelorMittal Indiana Harbor West Facility.
During five months in 2016, STEVENS made extensive modifications to existing foundations. Our crews performed heavy rigging followed by precision level and alignment of a new slab caster along with refurbishing equipment from the tundish down to the cut-off machine — all with minimal engineering. Most of the piping for the new spray chamber, water, grease, air, and hydraulic we field routed and installed “as-built”.
All of the work was performed over multiple shifts, working more than 70,000 man-hours without a single safety incident.
Categories : |
Pipe Fabrication
|
---|
Location: New Milton, West Virginia
STEVENS has performed several projects for MarkWest.
At their Midpoint Compressor site, near New Milton, West Virginia, our work started with a separate order with our wholly-owned subsidiary, CDMG, performing all of the pipe design. That was followed up by our fab shop, fabricating and shipping all of the spools as well as the slug catcher.
On-site, we performed site excavation and spoil removal. We placed 1,700 tons of limestone over a geotextile fabric. STEVENS performed all layouts, including anchor bolts, and installed more than 1,600 cy of concrete foundations and slabs encasing 110 tons of rebar.
With foundation, anchor bolts, and pipe racks in place, STEVENS proceeded to rig and set the three compressors, set and grout all equipment skids and tanks and then install and test all large and small bore piping. Much of this was done in the middle of winter.
Categories : |
Pipe Fabrication
|
---|
Location: East Chicago, Indiana
A third project well worth highlighting is the #2 Slab Caster Upgrade at ArcelorMittal Indiana Harbor West Facility.
During five months in 2016, STEVENS made extensive modifications to existing foundations. Our crews performed heavy rigging followed by precision level and alignment of a new slab caster along with refurbishing equipment from the tundish down to the cut-off machine — all with minimal engineering. Most of the piping for the new spray chamber, water, grease, air, and hydraulic we field routed and installed “as-built”.
All of the work was performed over multiple shifts, working more than 70,000 man-hours without a single safety incident.
Categories : |
Pipe Fabrication
|
---|
We provide our pipe fabricating services to the following areas.
Employee Verification
Our Offices
Quick Links
Contact Us