Perryman Forging Facility - Manufacturing Industry
LOCATION
Houston, PAINDUSTRY
Metals & ManufacturingSERVICES
- Engineering (CDMG)
- Pre-Engineered Buildings
- Civil Concrete
- Steel Erection
- Equipment Setting & Precision Alignment
- Construction Management
The Perryman forging facility represents a seamless single-source design-build project from the STEVENS Family of Companies. CDMG's Building Systems Group designed and supplied the 160,000 square foot pre-engineered metal building and 18,700 square foot bar shop extension, while STEVENS handled all construction including building erection, foundations, and equipment setting. The engineering included building and equipment foundations. The design and construction teams worked together to produce a quality project on an accelerated 18-month schedule, with final equipment design being established during the construction timeline.
Project Highlights
- Single-source design-build delivery
- 160,000 SF + 18,700 SF buildings
- 775 tons of rebar installed
- 11,065 cubic yards of concrete
- 2,920 linear feet of overhead crane runway
- 259 micropiles installed
- 1,244 tons of building steel
- 367 tons of sheeting
- 18-month accelerated timeline
- Includes client letter of recommendation
The project required installation of 775 tons of rebar and 11,065 cubic yards of concrete, along with 2,920 linear feet of overhead crane runway and 259 micropiles. STEVENS erected 1,244 tons of building steel and 367 tons of sheeting, and equipment setting work. The collaborative approach between STEVENS and CDMG enabled the accelerated timeline while maintaining the precision required for specialized manufacturing equipment installation. The client provided a letter of recommendation highlighting the project's exceptional success.