Professional steel erectors make erecting steel look easy. But it's not simple.
More often than not, it's a matter of experience and intuition that's guiding steel erectors.
However, there are steel erection processes that every steel erector does or should follow for a successful project.
Every individual in the steel erection industry should know these best practices before performing steel erection activities.
In the article below, we will discuss a few of the best practices steel erectors should follow during steel erection projects.
Table of Contents
Proper preparation is critical for the successful outcome of any project in the construction industry.
All key players should come together to make a plan to perform their next project safely, on time, and on budget.
The time a team spends in preparation is by far the most important task a structural steel erection team will complete to ensure that the project's outcome is a success.
Sequencing your steel erection project is essential to a successful project.
Different terms can be used when talking about sequencings, like divisions, zones, and areas.
It's a good idea to get with the general contractor to find out what direction they're going to take in constructing the project.
Once you've met with the general contractor, the erector should figure out what size the divisions need to be based on his crane size and what direction he wants to move to be most productive.
The erector should also request interior access if it is needed.
Once the steel erection team is ready to go, they'll meet with the fabricator to get the steel sequenced.
If sequencing is required, it's essential to meet with the fabricator as soon as possible so they can fabricate according to the desired sequence.
It's a team effort to make sequencing flow smoothly.
The general contractor, erector, and fabricator all need to be on the same page.
It's even more important when you are working in a tight site with no lay-down room.
Steel erection is a very hazardous occupation, so worker safety is the most critical part of any successful steel erection project.
Safety guidelines and protective equipment allow each and every member of your steel erection team to make it home to their family at the end of their shift.
It's also very important financially because of the high costs of worker's compensation insurance.
If a steel erection company has too many accidents, it can make it tough to compete in the marketplace. Having safety plans in place is crucial.
To ensure safety of workers, you should:
Site visits before any steel erection activities begin serve several purposes and are worth the effort it takes to make them happen.
Sometimes a few site visits are necessary before you get ready to take on a new project.
It's also good for the erector to take the foreman running the project along on the visit.
One issue many erectors face is the general contractor trying to get the erector on-site before everything is ready.
Many projects run behind schedule, and the general contractor wants to gain some ground with the steel erection team.
But starting a project before it's ready can cost steel erectors a lot of money.
During your visit to the job site, you should check to see:
Site visits can help make the steel erection process go smoother and prevent costly delays.
You should always have a site-specific erection plan reviewed and followed by every employee on every project.
Once the plan is created, the signature of the general contractor and steel erector should be on it.
It's also a good idea to have each employee sign it to document that they have read it.
Below are the components of a site-specific erection plan.
Before starting any steel erection activities, every worker needs to review the site-specific erection plan.
Your steel erection plan should include a site-specific hazard assessment and erection drawings and construction process for connecting the structural parts of a skeleton structure.
Your erection drawings and procedures should be prepared by a competent person and be made available to and reviewed by all workers before work begins.
These erection drawings and procedures must show the sequence in which the structure is erected.
They also need to ensure that the structure is stable during assembly and that any erection procedures added or changed on-site have been prepared by a competent person before they are used.
STEVENS offers high-quality, pre-engineered steel buildings and can work on almost every steel structure.
Our steel erectors will help you erect your pre-engineered steel building.
Our team of steel erectors takes pride in the relationships they build with their clients.
They will ensure that they meet their specific needs and requirements for every steel building project.
If you're interested in a steel building project with a leading steel building erection company, STEVENS, click the button below to contact a construction professional today.
Check out our other steel erection articles:
What Do Structural Steel Erectors Do?