Are you searching for a reliable pre-engineered metal building manufacturer in Cleveland, Ohio? If so, STEVENS Engineers and Constructors can provide you an advanced Metal Building Kit to streamline your next steel building project.
More and more industries in the state of Ohio prefer pre-fabricated buildings because of the unlimited, customizable options available. These customization options are imperative if you need your facility to be operationally efficient and aesthetically-pleasing space.
Whether it’s for a Government Building, Chemical Manufacturing Plant, Energy, and Power Plant, or any other industrial building your business requires, our top-notch Metal Building Kits can be designed and constructed to cater to your unique business requirements.
Read on to learn more about pre-engineered metal buildings and how STEVENS can help you construct a facility of this kind in Cleveland, OH.
STEVENS Engineers and Constructors has partnered with Nucor Building Systems to manufacture prefabricated buildings of highest quality standards. Nucor provides STEVENS with high-grade All-American steel that is made of 80% recycled steel (and is 100% recyclable).
We closely follow Nucor’s F.O.C.U.S principles - Fits, On-time delivery, Competitive pricing, Unbeatable services, and Solutions that work – and apply these to projects of any size and magnitude.
With 25 years of industry experience and leadership, Nucor helps STEVENS provide the most sustainable and durable buildings, which ultimately helps our clients adhere to an environmentally-minded business model. The more than 4,000 pre-fabricated steel structures that Nucor completes yearly is a vivid assessment of their capabilities.
Whether your metal service facility is involved in fabricating extra-long steel structures, or you’re operating a food and beverage manufacturing plant and need to expand your production capabilities, a prefabricated building can offer a plethora of powerful advantages for your company.
As your partner for your building project in Cleveland, STEVENS can help your business with its facility needs, allowing you to reap the benefits of prefabricated metal buildings which include the following:
STEVENS has been providing quality construction services across the industry spectrum for decades, so you can rest assured that you’ll only experience excellence in every aspect of our work.
Our team understands how challenging it is for industrial firms to secure financing for a new facility. To ensure that your capital investment meets your business objectives and deliver favorable returns, it’s crucial to conduct thorough research about the construction company that you will hire.
When you choose STEVENS as your prefabricated building provider for your Cleveland steel building project, we will not only supply the right materials for the job, but we will also help you design, prepare the site, construct, and physically erect your metal building.
STEVENS has the experience, workforce, resources, and expertise to:
With the utilization of BIM, a 3D building modeling software, and Nucor steel, our engineering, and construction company can meet your needs for your Pre-Engineered Metal Building Project.
Another benefit STEVENS offers is Building Information Modeling (BIM). BIM is an advanced 3D building modeling software that enables us to design your pre-engineered metal buildings.
This sophisticated imaging tool gives our architects, designers, engineers, and project managers a precise visual guide when designing, planning, and executing a building project.
With BIM, our team can be certain your prefabricated building is structurally sound and spacious enough for its intended function. This software technology identifies any potential hazards in the design structure so that problems can be prevented and solved before erection begins (this helps to avoid costly setbacks later on in the project).
STEVENS' utilization of BIM allows our team to complete your project by the promised timeframe, within your chosen budget, and without any issues during erection. STEVENS can provide you with a full-service team to develop, design, and erect a metal building structure that follows every specification and requirement you (and your industry) have.
Our team takes pride in forging a holistic and productive relationship with our clients, ensuring that we understand their specific needs and requirements for their pre-engineered metal building project.
STEVENS develops and erects pre-engineered metal buildings that fit clients' needs and designs, while also meeting all local codes and requirements for industry-specific buildings. With our company, you will have a full-service construction team (design, engineering, project management, installation, erection, and completion) for your next steel building project.
Regardless of the size and nature of your industrial facility, STEVENS can provide your company with the most advanced metal building kits for your next steel building project in Cleveland, OH.
Click on the button below to Get a Free Quote for your next pre-engineered building in Cleveland, Ohio
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Employee Verification
Our Offices
Quick Links