industrial contractor in Dearborn - Stevens engineers and contractors

Hard work and success can lead to the need to expand the facility for your business.  When your business comes to this need, STEVENS Engineers and Constructors is here to provide assistance for your project.

STEVENS has been providing quality services for the past 75 years for residents of Dearborn who are searching for the best and reliable project partner in the field of Industrial Contractors. Don’t hesitate to contact us, as our aim is to provide assistance with the assurance that you'll have a partner that is geared with the best of knowledge and tools for your project. 

Here at STEVENS, we know how hard it is to search for a trustworthy supplier in Michigan that can provide an on-time and good quality engineering service for your project. Matters like this can be solved by STEVENS, as we have the expertise to work hand in hand for all of your requirements and demands from an Industrial Contractor in Dearborn, MI.

STEVENS has a wide range of industries including:

1.Metals

2.Oil & Gas

3.Energy & Power

4.Chemical

5.Waste Water

6.Government

7.Food

Our highly skilled engineers and constructors are equipped to handle projects of any scale, while upholding best practices for safety, communication, and quality.
Specifically, we also have expertise in providing the following:

With a wide range of civil service and quality works we make sure that each of our clients are always satisfied with their project for expansion or renovation.

So if you ever find yourself looking for the best partner that could assist you with the civil concrete services in Dearborn, STEVENS is always open for these opportunities. One great example of our competence is building PPL Brunner Island which we and Shaw, our subcontractor, managed to complete 36,500 cy of excavation, 10,500 cy of mass pours of foundations and 8,000 LF of H-pile outsourced. 

Our services include: 

  1. Rebar
  2. Curing
  3. Water stops 
  4. Foundations 
  5. Anchor bolts 
  6. Expansion 
  7. Additives 
  8. Construction joints 
  9. Mass pours
  10.  Layout 
  11. Embedded metal 
  12. Quality control 

With 50 years in the industry working on large-scale construction projects with various clients form the industry, STEVENS has moved a lot of cubic yards of land for property developments.

De-watering, utility relocation, backfill, and mass excavation are some of the services we offer within the spectrum of comprehensive excavation and site work, 

Moreover, when it comes to scheduling, layout, reporting, safety, national regulations, and permitting we keep our standards and quality lifted and through the process of accomplishment we always ensure that we fill the clients’ exact specifications.

STEVENS knows how imperative it is too always look after safety as our profession involves a lot of possible danger. Luckily, with all our cautiousness we survive 50 years in service without any casualties. We will not tarnish the name that we have built in the industry by just violating safety regulations and standards.

STEVENS's aim is to only provide the best steel structures with all our commitment to hard work to service a wide range of industrial purposes. Our metal erection expertise spans from raising gang on buildings to changing crane rails and beyond.

And with STEVENS dedication to meet the industry’s demands for construction, our engineers and constructors never miss out on routine crane inspections, regular equipment checks, safety and quality control, and more.

Moreover, here with us, you can also obtain an advanced design and engineering services for engineered lifts and complete these projects with CDMG, our wholly-owned engineering subsidiary.

Heedless if it would be a bridge, highways or any other Sheet and H-pile projects as long as you have STEVENS it is possible to be accomplished. With the best pile driving equipment, we install H-Pile for deep foundation applications where anyone can lay their hands on. And, with our full-service construction and efficiency, most clients would take our excavation services simultaneous with our Sheet and H-pile capabilities. 

STEVENS completes geotechnical testing as-needed for soil stability and other factors to identify the structural requirements for each project. We know the benefit of a durable H-Pile in securing facilities located in challenging soil conditions and active seismic areas

Our rigging services for Dearborn include, but are not limited to: 

  1. Verifying weights 
  2. Alignment 
  3. Rigging limitations 
  4. Installations 
  5. Clearance restrictions 

In every comprehensive heavy rigging service that we offer we assure that each is done with complete consideration for security in every project, all with insurance for on-schedule accomplishment according to our client's exact specifications.

Here at STEVENS, we’re very strict with preventing hazards from rigging and heavy living projects affect our workers or our customers, as easing future complications is our engineers and constructor's main focus before an erection project.

Our engineers are built and skilled with results-driven planning, thorough scheduling, team collaboration, and detailed regular reporting are some of the characteristics our skilled engineers have. 

Here at STEVENS, we stand with the words that every successful industrial construction project begins with quality design and engineering; this is the reason behind every custom engineering service we offer to guarantee the outcome of every project matches our client's expectations seamlessly.

However, the project without communication is a partnership without understanding, that’s why our engineers are determined to build strong communication with our take holders; we let them collaborate on project decisions to make sure that everything is agreed upon before the construction.

When it comes to pipe fabrication, STEVENS also steps up as we also have our own fabricating shop which is capable of producing 10,000 LF of fabricated pipes monthly. Not only that we can supply, but STEVENS also can do specialized pipes for a more specific project with less cost.

And having these all provide us the ability to utilize state-of-the-art welding and cutting equipment and a variety of mandrel benders to produce the best of qualities for a pipe on the market with minimal rejected welds at a faster rate. 

This cut back our communication errors, faulty products, and delayed delivery. 

We also offer hydrostatic testing, protective coating solutions, chemical cleaning and flushing, documentation, and other pipe-related services. 

STEVENS maximizes the latest pipe fabrication technology, tooling, cutting, welding, and mandrel benders to provide fabricated pipes that are pinned with the quality control and local and national standards. 

And, with all these capabilities we never hold back in also covering the process of installing them. Whether it is ¾” to 20” of pipes, carbon steel to stainless and in-schedule XXS to standard, our professionals can handle those.

But, before getting into the project, the installation proposal is the very first thing STEVENS do to ensure that nothing will be placed on different positions later on. Furthermore, we comply with our pipe installation services all with sincerity of work, quality, efficiency, safety and of course a budget-friendly cost. 

 

By simplifying maintenance procedures and reduce energy consumption one machine at a time STEVENS has what it takes to give the best assistance for better productivity in Dearborn, MI.

And because obviously efficiency is our trademark, STEVENS only settle for equipment such as precision laser alignment devices as a part of our arsenal of world-class equipment.

There are other machines our talented field engineers operate such as a robotic total station to have full optimization of a machine’s full potential. Our team works to the one-thousandth of an inch to mitigate damage to bearings and seals.

And, for your plant machines to last for a bigger production, STEVENS professionals ensures thorough setting and alignment services while working quickly to reduce downtime.

All our years of achievement is not just because of our reliable service but also because we have Nucor all the way through as our steel manufacturer. Also, with Nucor, we can guarantee a durable and environmentally-friendly product as STEVENS uses 90% recycled steel from them. And, as partners, we ensure you that all we use in erecting our buildings are highly durable American-made steel.

One of our prime services is the Pre-engineered metal building kits, as it is pertinent for any kind of industry. These steel buildings STEVENS on Dearborn are known for their compliance, unlimited customization options, and aesthetically-pleasing design. 

Pre-engineered buildings are an ideal solution for future expansions for companies in Dearborn and can be easily customized for energy-efficiency because of its versatility. 

STEVENS also has BIM or Building Information Modeling. This tool helps us in showing the possible outlook of the project even before we start building, which gives us a great benefit as we can show it on our clients and apply all their idea and probable requirements.

Dearborn Construction Projects

STEVENS Engineers & Constructors is more than a general contractor.

We perform scheduling, layout, and reporting to ensure your project is completed on time and with the highest efficiency.  Because of all these capabilities, STEVENS is not just a general contractor based in Dearborn, Michigan. We also make sure that we have what it takes to do the project with all the trending technologies for industrial construction.

We have an extensive portfolio of successful industrial construction projects throughout the Dearborn area and beyond.

COMPLETED PROJECTS

  • EQUIPMENT SETTING
    EQUIPMENT SETTING
    Equipment Setting & Precision Alignment
  • WILLIAMS UNION BOILER
    WILLIAMS UNION BOILER
    Sheet & H-Pile
  • KINDER MORGAN: SCIO METER STATION
    KINDER MORGAN: SCIO METER STATION
    Site Work & Excavation
×
EQUIPMENT SETTING

This project was one of our most extensive equipment setting and precision alignment projects and also included multiple foundation modifications and installations.

The project lasted from September 2013 to May 2017 and required our expertise in the following areas:

  1. Rigging
  2. Level and alignment of new and refurbished equipment
  3. Charging machines at a rotary furnace throughout the new stretch-reducing mill and onto cooling beds
  4. New roll lathes
  5. Jib cranes
  6. Electrical control room setting
  7. Structural work for platforms and walkways
  8. New water, grease, air and hydraulics for piping
Categories :
Equipment Setting & Precision Alignment
×
General Contractor for Heavy Construction in DEARBORN | Sheet & H-Pile
General Contractor for Heavy Construction in DEARBORN | Sheet & H-Pile
WILLIAMS UNION BOILER
We worked with Dresden Energy to install H-Piling foundation support for their advanced combined cycle power plant. The Dresden Energy Facility is wholly owned and operated by Dominion Energy.

In addition to H-Piling services, we also completed the final excavation for each of the major foundation footprints.

We contracted with Williams Service Group to excavate 19,000 cy and installed H-Pile in the amount of 1712 pile, 85,300 LF total, and 200 splices.

Our team performed excavation work throughout fall and winter despite inclement weather conditions, allowing us to work on the foundations in early spring and erect the equipment over the summer. 

With the use of 3 pile driving rights and a six-day work week, we stayed within our tight 7-week schedule.

After our impressive performance and safety record, we were awarded the foundation contract for the Dresden Energy Facility foundations.

Categories :
Sheet & H-Pile
×
General Contractor for Heavy Construction in Dearborn | Site Work & Excavation
General Contractor for Heavy Construction in Dearborn | Site Work & Excavation
KINDER MORGAN: SCIO METER STATION

Utilizing the latest drone technology and best practices for on-site engineering, we moved 60,000 cy of dirt in the most efficient manner possible to complete our project for the Scio Meter Station. 

While adhering to all local, state and federal permits and environmental regulations, we met and exceeded all project specifications.

We installed and maintained proper erosion and sediment control during and after construction while utilizing CAT 740 articulating dumps, CAT excavators, CAT rollers and CAT backhoes to complete the project.

To ensure the site was safe for heavy equipment to cross existing pipelines on-site, we installed engineered air bridges. These bridges ensured a continual flow of traffic for highly efficient excavation and backfill. 

Owing to the skill levels of our constructors and our client's cooperation, we transported the excavation spoils of pad one over to pad two for immediate backfill.

Categories :
Site Work & Excavation
  • EQUIPMENT SETTING
    EQUIPMENT SETTING
    Equipment Setting & Precision Alignment
  • WILLIAMS UNION BOILER
    WILLIAMS UNION BOILER
    Sheet & H-Pile
×
EQUIPMENT SETTING

This project was one of our most extensive equipment setting and precision alignment projects and also included multiple foundation modifications and installations.

The project lasted from September 2013 to May 2017 and required our expertise in the following areas:

  1. Rigging
  2. Level and alignment of new and refurbished equipment
  3. Charging machines at a rotary furnace throughout the new stretch-reducing mill and onto cooling beds
  4. New roll lathes
  5. Jib cranes
  6. Electrical control room setting
  7. Structural work for platforms and walkways
  8. New water, grease, air and hydraulics for piping
Categories :
Equipment Setting & Precision Alignment
×
General Contractor for Heavy Construction in DEARBORN | Sheet & H-Pile
General Contractor for Heavy Construction in DEARBORN | Sheet & H-Pile
WILLIAMS UNION BOILER
We worked with Dresden Energy to install H-Piling foundation support for their advanced combined cycle power plant. The Dresden Energy Facility is wholly owned and operated by Dominion Energy.

In addition to H-Piling services, we also completed the final excavation for each of the major foundation footprints.

We contracted with Williams Service Group to excavate 19,000 cy and installed H-Pile in the amount of 1712 pile, 85,300 LF total, and 200 splices.

Our team performed excavation work throughout fall and winter despite inclement weather conditions, allowing us to work on the foundations in early spring and erect the equipment over the summer. 

With the use of 3 pile driving rights and a six-day work week, we stayed within our tight 7-week schedule.

After our impressive performance and safety record, we were awarded the foundation contract for the Dresden Energy Facility foundations.

Categories :
Sheet & H-Pile
  • KINDER MORGAN: SCIO METER STATION
    KINDER MORGAN: SCIO METER STATION
    Site Work & Excavation
×
General Contractor for Heavy Construction in Dearborn | Site Work & Excavation
General Contractor for Heavy Construction in Dearborn | Site Work & Excavation
KINDER MORGAN: SCIO METER STATION

Utilizing the latest drone technology and best practices for on-site engineering, we moved 60,000 cy of dirt in the most efficient manner possible to complete our project for the Scio Meter Station. 

While adhering to all local, state and federal permits and environmental regulations, we met and exceeded all project specifications.

We installed and maintained proper erosion and sediment control during and after construction while utilizing CAT 740 articulating dumps, CAT excavators, CAT rollers and CAT backhoes to complete the project.

To ensure the site was safe for heavy equipment to cross existing pipelines on-site, we installed engineered air bridges. These bridges ensured a continual flow of traffic for highly efficient excavation and backfill. 

Owing to the skill levels of our constructors and our client's cooperation, we transported the excavation spoils of pad one over to pad two for immediate backfill.

Categories :
Site Work & Excavation
  • EQUIPMENT SETTING
    EQUIPMENT SETTING
    Equipment Setting & Precision Alignment
×
EQUIPMENT SETTING

This project was one of our most extensive equipment setting and precision alignment projects and also included multiple foundation modifications and installations.

The project lasted from September 2013 to May 2017 and required our expertise in the following areas:

  1. Rigging
  2. Level and alignment of new and refurbished equipment
  3. Charging machines at a rotary furnace throughout the new stretch-reducing mill and onto cooling beds
  4. New roll lathes
  5. Jib cranes
  6. Electrical control room setting
  7. Structural work for platforms and walkways
  8. New water, grease, air and hydraulics for piping
Categories :
Equipment Setting & Precision Alignment
  • WILLIAMS UNION BOILER
    WILLIAMS UNION BOILER
    Sheet & H-Pile
×
General Contractor for Heavy Construction in DEARBORN | Sheet & H-Pile
General Contractor for Heavy Construction in DEARBORN | Sheet & H-Pile
WILLIAMS UNION BOILER
We worked with Dresden Energy to install H-Piling foundation support for their advanced combined cycle power plant. The Dresden Energy Facility is wholly owned and operated by Dominion Energy.

In addition to H-Piling services, we also completed the final excavation for each of the major foundation footprints.

We contracted with Williams Service Group to excavate 19,000 cy and installed H-Pile in the amount of 1712 pile, 85,300 LF total, and 200 splices.

Our team performed excavation work throughout fall and winter despite inclement weather conditions, allowing us to work on the foundations in early spring and erect the equipment over the summer. 

With the use of 3 pile driving rights and a six-day work week, we stayed within our tight 7-week schedule.

After our impressive performance and safety record, we were awarded the foundation contract for the Dresden Energy Facility foundations.

Categories :
Sheet & H-Pile
  • KINDER MORGAN: SCIO METER STATION
    KINDER MORGAN: SCIO METER STATION
    Site Work & Excavation
×
General Contractor for Heavy Construction in Dearborn | Site Work & Excavation
General Contractor for Heavy Construction in Dearborn | Site Work & Excavation
KINDER MORGAN: SCIO METER STATION

Utilizing the latest drone technology and best practices for on-site engineering, we moved 60,000 cy of dirt in the most efficient manner possible to complete our project for the Scio Meter Station. 

While adhering to all local, state and federal permits and environmental regulations, we met and exceeded all project specifications.

We installed and maintained proper erosion and sediment control during and after construction while utilizing CAT 740 articulating dumps, CAT excavators, CAT rollers and CAT backhoes to complete the project.

To ensure the site was safe for heavy equipment to cross existing pipelines on-site, we installed engineered air bridges. These bridges ensured a continual flow of traffic for highly efficient excavation and backfill. 

Owing to the skill levels of our constructors and our client's cooperation, we transported the excavation spoils of pad one over to pad two for immediate backfill.

Categories :
Site Work & Excavation

decades of experience

Bridge Building

STEVENS is celebrating nearly 50 years of high-quality construction services in the Dearborn area.

Our operators and engineers bring a diverse range of construction experience to each new project.

From our work in wastewater and bridge building to our current standing as your industrial contractor of choice, we leverage our broad-ranging experience to benefit every project we take on.

custom projects

Meeting Clients expectations in Dearborn, MI

Down to the smallest detail, every aspect of a STEVENS construction project is tailored to our clients' exact specifications.

Our team of engineers and constructors work directly with our clients to ensure all of your plans are considered and implemented for construction.

We are committed to exceeding our clients’ expectations with custom-designed industrial projects that deliver year after year.

Dearborn's Best industrial contractor

STEVENS Engineers and Constructors takes on jobs other companies will not even consider, and we do so successfully.

If you are looking for a Dearborn construction company to deliver the best outcome possible for your industrial project, click below to get started.
 

CONTACT STEVENS NOW

 

 

Stevens Engineers & Constructors

Address: 17107 Racho Rd, Brownstown Charter Twp, MI 48193

Phone: 734-821-5711

5
James Sibits Sr.

"I love working for them"