As a leading steel erection company in the Great Lakes Region, STEVENS Engineers & Constructors brings unparalleled expertise and knowledge to your steel structure projects.
With decades of experience in the construction industry, we excel at erecting new metal buildings and steel structures and repairing existing ones.
Our skilled steel erectors are adept at handling a wide range of metal building projects, including heavy steel erection and pre-engineered steel building erection for industrial facilities.
Our team is fully equipped to design and execute your project to meet your specific requirements.
With extensive industry experience, a strong commitment to service, and a proven track record of delivering high-quality finished products, STEVENS is your go-to partner for all your steel building projects.
In the structural steel industry, executing heavy steel erection projects requires the safe and efficient movement of iron and meticulous detailing.
At STEVENS, safety is one of our core values. Our team of dedicated safety professionals follows a zero-accident policy, ensuring all activities are engineered with safety in mind.
This commitment to safety protocols has established us as an industry leader in pre-engineered metal building erection projects.
Our structural steel erectors are experienced in working on large-scale projects, such as convention centers, communication towers, sports stadiums, and office buildings.
We prioritize safety and quality throughout the entire project lifecycle, from the arrival and assembly of steel components to the completion of the erection process.
Effective project management is crucial for the success of any steel erection project.
At STEVENS, we excel in managing the complexities of metal building projects, ensuring that every phase is executed precisely and efficiently.
Our experienced project management team oversees all aspects of the erection process, from the initial planning and design to the final construction and completion.
Our steel erection specialists are skilled in handling the logistics, scheduling, and resource allocation necessary for large-scale projects.
Whether it's a five-story structural steel project, a convention center, or a communication tower, we ensure every detail is meticulously planned and executed.
By utilizing advanced project management techniques, we can anticipate potential challenges and implement solutions swiftly, keeping your project on track and within budget.
STEVENS' project management approach integrates core values of safety, quality, and client satisfaction.
Our dedicated safety professionals ensure that all safety protocols are strictly followed, minimizing risks and promoting a safe working environment.
We also prioritize open communication with our clients, providing regular updates and maintaining transparency throughout the entire project lifecycle.
Choose STEVENS for your next steel structure project and experience the benefits of comprehensive project management.
Our commitment to excellence and our track record of successful steel-building projects makes us a trusted partner in the structural steel industry.
If you're looking for structural steel erection services, STEVENS Industrial Engineers and Constructors is here to provide outstanding service.
Click the link below for your custom quote and learn how we can assist you with your next steel erection project.
CURRENT PROJECTS
Location: Hammond, Indiana
STEVENS erected structural steel, joists, and decking for a 135,000-square-foot complex. This complex features six basketball courts, twelve volleyball courts, two regulation-size indoor soccer fields, and six batting cages. The facility also contains an upper-level track that can be used for running and walking, as well as for observing sporting events. The expert steel erection of this facility began in September 2017 and was completed in January 2018. Wilson Iron Works, a local fabrication shop, provided structural steel components.
Categories : |
Steel Erection
|
---|
Location: Springdale, Pennsylvania
STEVENS Engineers & Constructors, as a subcontractor to Black & Veatch, erected five separate buildings for a combined cycle facility located in Springdale, Pennsylvania. The specific structures that were erected by STEVENS included the following:
Control Building
Generation Building
Combustion Turbine Building
Water Treatment Building
Pump Building
Also included in the scope of work for this project were extensive excavation and foundation installation.
With safety and efficiency in mind, STEVENS had our wholly owned subsidiary, CDMG, design an adjustable spreader beam to lift and set the bridge tress that was assembled on the ground. STEVENS takes pride in being able to utilize the various talents within our family of companies. Due to this ability, we were able to complete difficult projects in a timely and safe manner.
Categories : |
Steel Erection
|
---|
Location: Vandergrift, Pennsylvania
Using various acids for the finishing steel, ATI needed to install a waste acid-neutralizing facility. STEVENS performed all of the civil, steel erection, and equipment setting.
Some of the work we completed included:
Piping and electrical work were subcontracted to others.
Categories : |
Steel Erection
|
---|
Location: Hammond, Indiana
STEVENS erected structural steel, joists, and decking for a 135,000-square-foot complex. This complex features six basketball courts, twelve volleyball courts, two regulation-size indoor soccer fields, and six batting cages. The facility also contains an upper-level track that can be used for running and walking, as well as for observing sporting events. The expert steel erection of this facility began in September 2017 and was completed in January 2018. Wilson Iron Works, a local fabrication shop, provided structural steel components.
Categories : |
Steel Erection
|
---|
Location: Springdale, Pennsylvania
STEVENS Engineers & Constructors, as a subcontractor to Black & Veatch, erected five separate buildings for a combined cycle facility located in Springdale, Pennsylvania. The specific structures that were erected by STEVENS included the following:
Control Building
Generation Building
Combustion Turbine Building
Water Treatment Building
Pump Building
Also included in the scope of work for this project were extensive excavation and foundation installation.
With safety and efficiency in mind, STEVENS had our wholly owned subsidiary, CDMG, design an adjustable spreader beam to lift and set the bridge tress that was assembled on the ground. STEVENS takes pride in being able to utilize the various talents within our family of companies. Due to this ability, we were able to complete difficult projects in a timely and safe manner.
Categories : |
Steel Erection
|
---|
Location: Vandergrift, Pennsylvania
Using various acids for the finishing steel, ATI needed to install a waste acid-neutralizing facility. STEVENS performed all of the civil, steel erection, and equipment setting.
Some of the work we completed included:
Piping and electrical work were subcontracted to others.
Categories : |
Steel Erection
|
---|
Location: Hammond, Indiana
STEVENS erected structural steel, joists, and decking for a 135,000-square-foot complex. This complex features six basketball courts, twelve volleyball courts, two regulation-size indoor soccer fields, and six batting cages. The facility also contains an upper-level track that can be used for running and walking, as well as for observing sporting events. The expert steel erection of this facility began in September 2017 and was completed in January 2018. Wilson Iron Works, a local fabrication shop, provided structural steel components.
Categories : |
Steel Erection
|
---|
Location: Springdale, Pennsylvania
STEVENS Engineers & Constructors, as a subcontractor to Black & Veatch, erected five separate buildings for a combined cycle facility located in Springdale, Pennsylvania. The specific structures that were erected by STEVENS included the following:
Control Building
Generation Building
Combustion Turbine Building
Water Treatment Building
Pump Building
Also included in the scope of work for this project were extensive excavation and foundation installation.
With safety and efficiency in mind, STEVENS had our wholly owned subsidiary, CDMG, design an adjustable spreader beam to lift and set the bridge tress that was assembled on the ground. STEVENS takes pride in being able to utilize the various talents within our family of companies. Due to this ability, we were able to complete difficult projects in a timely and safe manner.
Categories : |
Steel Erection
|
---|
Location: Vandergrift, Pennsylvania
Using various acids for the finishing steel, ATI needed to install a waste acid-neutralizing facility. STEVENS performed all of the civil, steel erection, and equipment setting.
Some of the work we completed included:
Piping and electrical work were subcontracted to others.
Categories : |
Steel Erection
|
---|