Having the best Metal Building Kits is essential for the design and construction of a Government Building, Chemical Manufacturing Plant, Energy and Power Plant. If you are looking for a pre-engineered metal building manufacturer in Dearborn, Michigan that you can trust, STEVENS Engineers and Constructors should be your choice. We can provide you an advanced Metal Building Kit to advance your next steel building project.
Pre-engineered buildings are becoming the choice of more and more Dearborn businesses because of the customizable options they give your business. If an operationally efficient and beautiful-looking space is what you needed in your facility, these customization options will help you achieve that.
Read on to learn how pre-engineered metal buildings are the ideal choice for constructing any structure in Dearborn, Michigan, and how STEVENS Engineers and Constructions can help you.
Whether your metal service facility is involved in fabricating extra-long steel structures, or you’re operating a food and beverage manufacturing plant and need to expand your production capabilities, a prefabricated building can offer a plethora of compelling advantages for your company.
As your partner for your building project in Dearborn, STEVENS can help your business with its facility needs, providing you with the benefits of prefabricated metal buildings which include the following:
STEVENS has been providing quality construction services in the industry for seven decades. You can rest assured that you’ll only experience excellence in every aspect of our work.
Our team understands the challenges that industrial firms have in securing financing for a new facility. You need to ensure that your capital investment meets your business objectives and delivers favorable returns. This is why it is imperative to conduct thorough research before hiring a construction company.
Choosing STEVENS as the prefabricated building provider for your Dearborn steel building project means beyond receiving the right materials for the job, we will also provide assistance in the design, site preparation, construction and physically assembling your metal building.
STEVENS has the experience, workforce, resources, and expertise to:
Our engineering and construction company can meet your needs for your Pre-Engineered Metal Building Project with the combined utilization of BIM, a 3D building modeling software, and Nucor steel.
STEVENS Engineers and Constructors has partnered with Nucor Building Systems to manufacture prefabricated buildings of highest quality standards. Nucor provides STEVENS with high-grade All-American steel that is made of 80% recycled steel (and is 100% recyclable). With this recycled steel, our clients can ensure that they will have excellent quality while also being able to adhere to an environmentally-minded business model.
We closely follow Nucor’s F.O.C.U.S principles - Fits, On-time delivery, Competitive pricing, Unbeatable services, and Solutions that work – and apply these to projects of any size and magnitude.
Nucor helps STEVENS in providing the most sustainable and durable buildings. In their 25 years of industry experience and leadership. Nucor completes more than 4,000 pre-fabricated steel structures annually, which gives a clear picture of their capabilities.
Another benefit STEVENS offers is Building Information Modeling (BIM). BIM is an advanced 3D building modeling software that enables us to design your pre-engineered metal buildings.
This sophisticated imaging tool gives our architects, designers, engineers, and project managers a precise visual guide when designing, planning, and executing a building project.
The utilization of BIM enables our team to be confident that your prefabricated building is structurally sound and spacious enough for its intended function. This software technology identifies any potential hazards in the design structure to prevent any costly setbacks before the project begins.
With BIM, our team can complete your project smoothly by the promised timeframe and within your chosen budget. STEVENS can provide you with a full-service team to develop, design, and erect a metal building structure that follows every specification and requirement you (and your industry) have.
Our team takes pride in creating a meaningful and productive relationship with our clients, ensuring that we understand their specific needs and requirements for their pre-engineered metal building project.
STEVENS develops and erects pre-engineered metal buildings that fit clients' needs and designs, while also meeting all local codes and requirements for industry-specific buildings. With our company, you will have a full-service construction team (design, engineering, project management, installation, erection, and completion) for your next steel building project.
Regardless of the size and nature of your industrial facility, STEVENS can provide your company with the most advanced metal building kits for your next steel building project in Dearborn, MI.
Click on the button below to Get a Free Quote for your next pre-engineered building in Dearborn, Michigan today!
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Employee Verification
Our Offices
Quick Links
Contact Us