Are you looking for a trustworthy pre-engineered metal building manufacturer in Gary, IN? If yes, let STEVENS Engineers and Constructors help you with their advanced Metal Building Kit in streamlining your next steel building project.
Due to the extensive customization options available, many industries in Indiana favor pre-engineered buildings. This kind of customization is an excellent option for those companies that require buildings that are efficient in function and design.
Regardless if it’s for a Government Building, Chemical Manufacturing Plant, Energy, and Power Plant, or any other industrial building your business requires, our Metal Building Kits can make all your dream plans for your business come true.
Read on to learn more about pre-engineered metal buildings and how STEVENS can help you construct a facility of this kind in Gary, IN.
Regardless if you’re operating a metal service facility that manufactures extra-long steel structures, or your food and beverage manufacturing business needs additional manufacturing capabilities, prefabricated structures can provide many benefits for your enterprise.
As your building project partner in Gary, STEVENS will help your business with its facility needs, providing you with the benefits of prefabricated metal buildings which include the following:
STEVENS has been providing quality construction services to the industry for over 70 years. You can be confident we have everything you need for your pre-constructed building.
Our team understands how challenging it is for industrial firms to secure financing for a new facility. It’s crucial to conduct a comprehensive research about the construction firm that you will have a partnership with to ensure that your capital investment meets your business objectives and delivers advantageous revenues.
When you decide to have STEVENS provide a prefabricated building for your steel building project at Gary, you can feel confident that you are being supplied with the best materials as well as have a team to help you create your desired design, site preparation, construction, and physically erect your metal building.
STEVENS has the experience, workforce, resources, and expertise to:
With the utilization of BIM, a 3D building modeling software, and Nucor steel, our Engineering and Construction Company can meet your needs for your Pre-Engineered Metal Building Project.
STEVENS Engineers and Constructors have Nucor as their partner for constructing high-quality prefabricated building standards. Nucor provides first-class All-American steel composed of 80% recycled steel (and is 100% recyclable).
We strictly follow Nucor’s F.O.C.U.S principles - Fits, On-time delivery, Competitive pricing, Unbeatable services, and Solutions that work – and apply these to projects of any size and magnitude.
With more than two decades of leadership and experience, Nucor has been a part of STEVENS in every sustainable and durable building project, allowing our clients to adhere to an environmentally-minded business model. Four thousand prefabricated projects done yearly is a distinct description of Nucor’s abilities.
Our advanced 3D building modeling software is one of our pride here at STEVENS, as it lets us design your pre-engineered metal buildings efficiently and accurately.
This sophisticated imaging tool gives our architects, designers, engineers, and project managers a precise visual guide when designing, planning, and executing a building project.
With BIM, our professionals are confident that your prefabricated building will be structurally sound and large enough for its intended function. This software technology identifies any potential hazards in the design structure so that problems can be prevented and solved before erection begins (this helps to avoid costly setbacks later on in the project).
By utilizing BIM, our team at STEVENS is confidently able to finish your projects in the given time frame, with no issues in construction and within your budget. STEVENS can provide you with a full-service team to develop, design, and erect a metal building structure that follows every specification and requirement you (and your industry) have.
STEVENS strives to build a meaningful and collaborative partnership with our clients to ensure that we satisfy their unique requirements for their pre-engineered metal building project.
STEVENS will develop and construct your pre-engineered metal buildings based on your specifications while also meeting all local codes and requirements for industry-specific buildings. With us, you can obtain a full-service professional team (design, engineering, project management, installation, erection, and completion) for your upcoming steel building project.
Click on the button below to Get a Free Quote for your next pre-engineered building in Gary, Indiana, today!
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Employee Verification
Our Offices
Quick Links
Contact Us