Pre-Engineered Steel Buildings Supplied, Constructed & Designed for your Commercial Construction Project

At STEVENS, we can provide an advanced Metal Building Kits to streamline your next steel building project in Kettering, OH.

Pre-engineered metal building kits have unlimited, customizable options to make yours unique and one-of-a-kind.

The customizations and preference you decide on are what turn a standard metal building kit into your tailor-made metal building for a Government Building, Food Manufacturing Building, Energy and Power Plant, or any other number of industrial building your business requires.

STEVENS uses customizable, high-quality pre-engineered metal buildings that have industry-leading capabilities and are constructed with American-made, recyclable Nucor steel. 

BEST PRE-ENGINEERED METAL BUILDING MANUFACTURER IN KETTERING, OH

Have you been searching for a reputable pre-engineered metal building manufacturer in Kettering, Ohio? Then check out STEVENS Engineers and Constructors. Our advanced Metal Building Kit can streamline your next steel building project.

Prefabricated buildings are a growing trend amongst business industries in the state of Ohio. This can be attributed to a wide variety of reasons, such as the availability of customizing options they provide.

Steel building kit construction Kettering, OH | STEVENS

Whether it’s for a Government Building, Chemical Manufacturing Plant, Energy, and Power Plant, or any other industrial building your business requires, our top-notch Metal Building Kits can be designed and constructed to cater to your unique business requirements. 

Read on to learn more about pre-engineered metal buildings and how STEVENS can help you construct a facility of this kind in Kettering, OH. 

WHY A PRE-ENGINEERED METAL BUILDING IS THE BEST CHOICE FOR YOU

Regardless of what industry you’re in, be it a metal service facility that specializes in fabricating extra-long steel structures or a food and beverage manufacturing plant aiming for production expansion, you can make the most out of a prefabricated building.

Below is a list of benefits that industries can enjoy from prefabricated metal buildings:

  • Aesthetically Pleasing Design 
  • Fully Customizable
  • Versatile and Flexible 
  • Fast and Efficient
  • Cost-Effective
  • Energy Efficient
  • Environmentally-Friendly

STEVENS has been providing quality construction services across the industry spectrum for decades, so you can rest assured that you’ll only experience excellence in every aspect of our work.  


STEVENS – Your Reliable Partner for Pre-Engineered Steel Buildings in Kettering

Our team understands how challenging it is for industrial firms to secure financing for a new facility. To ensure that your capital investment meets your business objectives and delivers favorable returns, it’s crucial to conduct a thorough research about the construction company that you will hire.

When you choose STEVENS as your prefabricated building provider for your Kettering steel building project, we will not only supply the right materials for the job. We will also help you design, prepare the site, construct, and physically erect your metal building.

STEVENS has the experience, workforce, resources, and expertise to:

  • Custom-design your metal building kit to your specific needs and preferences.
  • Manage the building project from development and design to erection and completion.
  • Construct your metal building kit and bring your building dreams to reality.

With the utilization of BIM, a 3D building modeling software, and Nucor steel, our Engineering and Construction Company can meet your needs for your Pre-Engineered Metal Building Project.

WHY NUCOR BUILDING SYSTEMS?Nucor Authorized Metal Building Partner Kettering, OH | STEVENS

STEVENS Engineers and Constructors has partnered with Nucor Building Systems to manufacture prefabricated buildings of highest quality standards. Nucor provides STEVENS with high-grade All-American steel that is made of 80% recycled steel (and is 100% recyclable).

We closely follow Nucor’s F.O.C.U.S principles - Fits, On-time delivery, Competitive pricing, Unbeatable services, and Solutions that work – and apply these to projects of any size and magnitude.

With 25 years of industry experience and leadership, Nucor helps STEVENS provide the most sustainable and durable buildings, which ultimately helps our clients adhere to an environmentally-minded business model. The more than 4,000 pre-fabricated steel structures that Nucor completes yearly is a vivid assessment of their capabilities.

HOW DOES BIM SOFTWARE BENEFIT MY PRE-ENGINEERED STEEL BUILDING?

BIM is an advanced 3D building modeling software that enables us to design your pre-engineered metal buildings. This sophisticated imaging tool gives our architects, designers, engineers, and project managers a precise visual guide when designing, planning, and executing a building project. 

With BIM, our team can be certain your prefabricated building is structurally sound and spacious enough for its intended function. This software technology identifies any potential hazards in the design structure so that problems can be prevented and solved before erection begins (this helps to avoid costly setbacks later on in the project).

STEVENS' utilization of BIM allows our team to complete your project by the promised timeframe, within your chosen budget, and without any issues during erection. STEVENS can provide you with a full-service team to develop, design, and erect a metal building structure that follows every specification and requirement you (and your industry) have.

#1 US custom metal building supplier and construction company Kettering, OH | STEVENS

Contact STEVENS for your Pre-Engineered Metal Building in Kettering

Here at STEVENS, our team is always dedicated to serving the industrial companies of Kettering by offering the state-of-the-art pre-engineered metal buildings as well as ensuring that we understand all of our clients’ needs and concerns.

STEVENS develops and erects pre-engineered metal buildings that fit clients' needs and designs, while also meeting all local codes and requirements for industry-specific buildings. With our company, you will have a full-service construction team (design, engineering, project management, installation, erection, and completion) for your next steel building project.

Regardless of the size and nature of your industrial facility, STEVENS can provide your company with the most advanced metal building kits for your next steel building project in Kettering, OH.

Click on the button below to Get a Free Quote for your next pre-engineered building in Kettering, Ohio, today!

Get a Quote

PROJECTS

  • PRECOAT
    PRECOAT
    Pre-Engineered Buildings
  • PPL BRUNNER ISLAND
    PPL BRUNNER ISLAND
    Pre-Engineered Buildings
×
PRECOAT

Location: Weirton, West Virginia

As is often the case, there is much more to a “pre-engineered” building than the building itself.

In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.

The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.

The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.

All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.

Categories :
Pre-Engineered Buildings
×
PPL BRUNNER ISLAND

Location: York Haven, Pennsylvania

This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:

Waste Water Treatment Plant, Civil, Building and Site Work 2006

  • Buildings
    • Influent 70’ x 40’ x 60’ highFilter B
    • uilding 125’ x 75’ x 55’ high
    • Filter Extension (Pump Room) 95’ x 25’ x 15’ high
      • Underground Piping and Electrical
      • Coatings
        • Sumps and Building
        • Trenches Building
        • Tanks Area
        • Unloading Truck Area
          Mix Tank
        • Sludge Tanks
      • Steel Work
        • Clarifier Walkways
        • Mix Tank Platforms
        • Building Sump Platforms
      • Sludge Tank Platforms
        • Site Work
        • Roads
        • Fencing
        • Site Re-grading
        • Storm Water
Categories :
Pre-Engineered Buildings
  • PRECOAT
    PRECOAT
    Pre-Engineered Buildings
  • PPL BRUNNER ISLAND
    PPL BRUNNER ISLAND
    Pre-Engineered Buildings
×
PRECOAT

Location: Weirton, West Virginia

As is often the case, there is much more to a “pre-engineered” building than the building itself.

In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.

The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.

The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.

All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.

Categories :
Pre-Engineered Buildings
×
PPL BRUNNER ISLAND

Location: York Haven, Pennsylvania

This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:

Waste Water Treatment Plant, Civil, Building and Site Work 2006

  • Buildings
    • Influent 70’ x 40’ x 60’ highFilter B
    • uilding 125’ x 75’ x 55’ high
    • Filter Extension (Pump Room) 95’ x 25’ x 15’ high
      • Underground Piping and Electrical
      • Coatings
        • Sumps and Building
        • Trenches Building
        • Tanks Area
        • Unloading Truck Area
          Mix Tank
        • Sludge Tanks
      • Steel Work
        • Clarifier Walkways
        • Mix Tank Platforms
        • Building Sump Platforms
      • Sludge Tank Platforms
        • Site Work
        • Roads
        • Fencing
        • Site Re-grading
        • Storm Water
Categories :
Pre-Engineered Buildings
  • PRECOAT
    PRECOAT
    Pre-Engineered Buildings
×
PRECOAT

Location: Weirton, West Virginia

As is often the case, there is much more to a “pre-engineered” building than the building itself.

In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.

The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.

The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.

All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.

Categories :
Pre-Engineered Buildings
  • PPL BRUNNER ISLAND
    PPL BRUNNER ISLAND
    Pre-Engineered Buildings
×
PPL BRUNNER ISLAND

Location: York Haven, Pennsylvania

This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:

Waste Water Treatment Plant, Civil, Building and Site Work 2006

  • Buildings
    • Influent 70’ x 40’ x 60’ highFilter B
    • uilding 125’ x 75’ x 55’ high
    • Filter Extension (Pump Room) 95’ x 25’ x 15’ high
      • Underground Piping and Electrical
      • Coatings
        • Sumps and Building
        • Trenches Building
        • Tanks Area
        • Unloading Truck Area
          Mix Tank
        • Sludge Tanks
      • Steel Work
        • Clarifier Walkways
        • Mix Tank Platforms
        • Building Sump Platforms
      • Sludge Tank Platforms
        • Site Work
        • Roads
        • Fencing
        • Site Re-grading
        • Storm Water
Categories :
Pre-Engineered Buildings