At STEVENS, we can provide advanced Metal Building Kits to streamline your next steel building project in Niles, OH.
Pre-engineered metal building kits have unlimited, customizable options to make yours unique and one-of-a-kind.
The customizations and preference you decide on are what turn a standard metal building kit into your tailor-made metal building for a Government Building, Food Manufacturing Building, Energy and Power Plant, or any other number of industrial building your business requires.
STEVENS uses customizable, high-quality pre-engineered metal buildings that have industry-leading capabilities and are constructed with American-made, recyclable Nucor steel.
STEVENS Engineers and Constructors can help design and erect your pre-engineered metal building in Niles, Ohio. We can provide you an advanced Metal Building Kit to streamline your next steel building project.
Pre-fabricated buildings are becoming the choice of more and more industries in Niles because of the unlimited, customizable options they give you when expanding your business. If an operationally efficient and aesthetically-pleasing space is what you needed in your facility, these pre-engineered metal building kits will benefit your business.
Whether it’s for a Government Building, Chemical Manufacturing Plant, Energy and Power Plant, or another industrial structure that accommodates your expanding business, our top-notch Metal Building Kits can be designed and constructed to cater to your unique business requirements.
Read on to learn more about pre-engineered metal buildings and how STEVENS can help you construct a facility of this kind in Niles, OH.
Whether your metal service facility is involved in fabricating extra-long steel structures, or you’re operating a food and beverage manufacturing plant and need to expand your production capabilities, a prefabricated building can offer plenty of great benefits for your company.
As your partner for your building project in Niles, STEVENS can help your business with its facility needs, allowing you to have the benefits of prefabricated metal buildings which include the following:
STEVENS will not only provide you with supplies of superior quality for your unique construction projects, but we will also help you design, prepare the site, construct, and physically erect your metal building.
Our team understands how challenging it is for industrial firms to secure financing for a new facility. To ensure that your capital investment meets your business objectives and deliver favorable returns, it’s crucial to conduct thorough research about the construction company that you will hire.
The customizations and preferences you decide on are what turn a standard metal building kit into your tailor-made metal building for a Government Building, Food Manufacturing Building, Energy and Power Plant, or any other type of industrial building to fit your business needs.
Another reason to choose STEVENS as your provider of pre-engineered buildings is because of our experience in construction and engineering. For over 70 years, STEVENS has been providing excellent service in helping industrial companies meet their design and construction needs. We can assure you that we have everything you need for your pre-constructed building.
STEVENS has the knowledge, labor force, resources, and proficiency to:
With the utilization of BIM, a 3D building modeling software, and Nucor steel, our engineering and Construction Company can meet your needs for your Pre-Engineered Metal Building Project.
STEVENS Engineers and Constructors has been working with Nucor Building Systems for over 25 years because Nucor provides STEVENS with high-grade All-American steel that is made of 80% recycled steel (and is 100% recyclable) that assures the quality of the products.
We strictly follow Nucor’s F.O.C.U.S principles - Fits, On-time delivery, Competitive pricing, Unbeatable services, and Solutions that work. We apply these to our projects of any size and nature.
Nucor helps STEVENS build the sturdiest and most sustainable buildings across America. Construction with these recyclable materials ultimately helps our clients adhere to an environmentally-minded business model. The more than 4,000 pre-fabricated steel structures that Nucor completes yearly is a vivid assessment of their capabilities. For over 25 years, Nucor has been providing excellent service to STEVENS and its other clients.
STEVENS proudly offers Building Information Modeling (BIM). BIM is an advanced 3D building modeling software that enables us to design your pre-engineered metal buildings.
This advanced imaging tool helps our architects, designers, engineers, and project managers accurately visualize the design, plan, and execution of building projects.
Our team is 100% sure that your prefabricated building will be designed for its intended function of spaciousness and functionality. BIM is a software program that identifies any potential hazards in the design structure so that problems can be prevented and solved before erection begins, which helps to avoid costly setbacks later on in the project.
With the BIM utilization STEVENS dedicated team can complete your project by the promised time frame, within your chosen budget, and without any problems when the building is being erected. STEVENS can provide you with a full-service team to develop, design, and construct a metal building structure that follows every specification and requirement you (and your industry) have.
STEVENS is dedicated to creating a meaningful relationship with our clients as strong as our prefabricated buildings, guaranteeing that we understand their specific needs and requirements for their pre-engineered metal building project.
STEVENS develops and erects pre-engineered metal buildings that fit clients' needs and designs, while also meeting all local codes and requirements for industry-specific buildings. With our company, you will have a full-service construction team (design, engineering, project management, installation, erection, and completion) for your next steel building project.
No matter the size and functionality of the structure you would like to build, STEVENS will give your company the most advanced metal building kits for your next steel building project in Niles, OH.
Click on the button below to Get a Free Quote for your next pre-engineered building in Niles, Ohio, today!
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Employee Verification
Our Offices
Quick Links
Contact Us