At STEVENS, we can provide advanced Metal Building Kits to streamline your next steel building project in Parma, OH.
Pre-engineered metal building kits have unlimited, customizable options to make yours unique and one-of-a-kind.
The customizations and preference you decide on are what turn a standard metal building kit into your tailor-made metal building for a Government Building, Food Manufacturing Building, Energy and Power Plant, or any other number of industrial building your business requires.
STEVENS uses customizable, high-quality pre-engineered metal buildings that have industry-leading capabilities and are constructed with American-made, recyclable Nucor steel.
Do you require a dependable pre-engineered metal building manufacturer in Parma, Ohio? STEVENS Engineers and Constructors can provide you with an innovative Metal Building Kit that can streamline your steel building project.
An increasing number of commercial and industrial facilities in the state of Ohio choose pre-fabricated buildings because of the customizable options available. With these customization options, you can build a structure that is not only operationally efficient but aesthetically pleasing as well.
From Chemical Manufacturing Plants and Waste Water Facilities to Power Plants and Government Buildings, our Metal Building Kits can be designed and erected in ways that will satisfy your unique business needs and operational requirements.
Read on to learn more about pre-engineered metal buildings and how STEVENS can help you construct a facility of this kind in Parma, OH.
Whether your metal service facility is involved in fabricating long steel structures, or you’re planning to expand the production efficiency of your food and beverage plant, a prefabricated building offers many advantages for your company.
As your partner for your building project in Parma, STEVENS can help your business with its steel facility needs, offering you the benefits of prefabricated metal buildings such as:
STEVENS has been providing quality construction services across the industry spectrum for decades, giving you the assurance you need that your steel construction project will turn out just as you imagined.
We at STEVENS understand the difficulties of securing funds for the construction of a new facility. To ensure that your capital investment meets your business objectives and delivers favorable returns, it’s crucial to conduct thorough research about the construction company that you will hire.
When you choose STEVENS as your pre-fabricated building provider for your Parma steel building project, we will not only supply the right materials for the job. We will also help you design, prepare the site, construct, and physically erect your metal building.
STEVENS has the experience, workforce, resources, and expertise to:
With the utilization of BIM, a 3D building modeling software, and Nucor steel, STEVENS Engineering and Construction company can meet your needs for your Pre-Engineered Metal Building Project.
STEVENS Engineers and Constructors work with Nucor Building Systems to manufacture prefabricated buildings of highest quality standards. Nucor provides STEVENS with high-grade All-American steel that is made of 80% recycled steel (and is 100% recyclable).
We strictly follow Nucor’s F.O.C.U.S principles - Fits, On-time delivery, Competitive pricing, Unbeatable services, and Solutions that work – and apply these to projects of any size and magnitude.
With over 25 years of industry experience and leadership, Nucor helps STEVENS provide the most sustainable and durable buildings, which ultimately helps our clients adhere to an environmentally-minded business model. The more than 4,000 pre-fabricated steel structures that Nucor completes yearly is a vivid assessment of their capabilities.
Another benefit STEVENS offers is Building Information Modeling (BIM). BIM is an advanced 3D building modeling software that enables us to design your pre-engineered metal buildings.
This modern imaging tool enables our architects, designers, engineers, and project managers to have a precise visual guide when designing, planning and executing a building project.
With BIM, our team can be confident that your prefabricated building is structurally sound and spacious enough for its intended function. This software technology identifies any potential hazards in the design structure so that problems can be prevented and solved before erection begins (this helps to avoid costly setbacks later on in the project).
STEVENS' utilization of BIM allows our team to complete your project by the promised timeframe, within your chosen budget, and without any issues during erection. STEVENS can provide you with a full-service team to design, develop, and erect a metal building structure that follows every specification and requirement you (and your industry) have.
Our team takes pride in creating a meaningful and productive relationship with our clients, ensuring that we understand their specific needs and requirements for their pre-engineered metal building project.
STEVENS develops and erects pre-engineered metal buildings that fit clients' needs and designs, while also meeting all local codes and requirements for industry-specific buildings. With our company, you will have a full-service construction team (design, engineering, project management, installation, erection, and completion) for your next steel building project.
Regardless of the size and nature of your industrial facility, STEVENS can provide your company with the most advanced metal building kits for your next steel building project in Parma, OH.
Click on the button below to Get a Free Quote for your next pre-engineered building in Parma, Ohio, today!
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Employee Verification
Our Offices
Quick Links
Contact Us